PEX Crimp Fitting (https://www.ppsu-pex-fittings.com/product/f2159-pex-crimp-fitting/) installation precautions:
1. When constructing the surface layer, it is not allowed to pick, chisel, cut, drill and nail the filling layer, and no objects shall be wedge into the filling layer;
2. The construction of the floor heating surface layer must be carried out after the filling layer reaches the required strength;
3. At the junction of the surface layer (stone, facing brick) and the internal and external walls, columns, etc., there should be 8mm wide expansion joints (shield by skirting); when laying wooden floors, ≥14mm expansion joints should be left;
4. For wet rooms such as toilets, waterproof the upper part of the PEX Expansion Ring (https://www.ppsu-pex-fittings.com/product/metric-size-fitting/metric-size-fitting-reinforcing-ring/) filling layer again.