How To Maintain The Performance Built Log Splitter


Posted December 7, 2020 by xuepaer

What to pay attention to in the maintenance and maintenance of Performance Built Log Splitter
 
What to pay attention to in the maintenance and maintenance of Performance Built Log Splitter ( https://www.cnsuperpower.com/product/log-splitter/ )
After purchasing the Performance Built Log Splitter, there will be some large and small problems during the installation, especially the installation of the Performance Built Log Splitter three knives has brought troubles to the staff. If you do not understand the reasons for the installation instructions in detail, this way Not only greatly slowed down the time put into use, but also wasted a lot of staff energy.

The Performance Built Log Splitter is fixedly installed, and the axis of the shredder pulley and the power machine pulley should be parallel, and the grooves of the two drive pulleys should be in the same straight line. Otherwise, not only will the acceleration components be damaged, but the belt will be easily dropped. After the Performance Built Log Splitter arrives at the installation site, before installation, carefully check whether the connecting parts are loose during transportation. The Performance Built Log Splitter has been carefully installed and checked before leaving the factory.

Performance Built Log Splitter has advanced manufacturing technology, high rotor dynamic balance accuracy, small welding deformation, high assembly accuracy, and stable operation. Therefore, the Performance Built Log Splitter should not be installed with elastic shock absorbers, but the Performance Built Log Splitter should be leveled and fixed. Good anchor bolts to ensure that the Performance Built Log Splitter is firmly fixed on the foundation. The Performance Built Log Splitter is installed separately, or installed in the basement, but it is necessary to ensure a good ventilation effect and maintenance space to achieve a sound insulation effect.

Petrol Log Splitter ( https://www.cnsuperpower.com/product/log-splitter/ ) has to do either mechanical discharge or pneumatic negative pressure discharge: all connecting sections and air shutters should be sealed and airtight, and minimize the number of elbows in the pipeline installation, the direction of the air pipe and the air outlet The method must be installed correctly and so on.
-- END ---
Share Facebook Twitter
Print Friendly and PDF DisclaimerReport Abuse
Contact Email [email protected]
Issued By xuepaer
Phone 0086 (0)573 8464 3695
Business Address 391 Huimin Road,Huimin Town, Jiashan City,Zhejiang Province, P.R. China
Country China
Categories Business
Last Updated December 7, 2020