Hot Air Stenter Boot Operation


Posted January 27, 2021 by printingmachinelicheng

Click the cloth feeding mechanism button to enter the cloth feeding mechanism operation interface, and click the cloth feeding master control switch in the upper left corner to red.
 
1 Turn on the Hot Air Stenter ( https://www.hotairstenter.com/product/hot-air-stenter.html )

1.1 Click the cloth feeding mechanism button to enter the cloth feeding mechanism operation interface, and click the cloth feeding master control switch in the upper left corner to red.

1.2 Click the cloth discharging mechanism button to enter the cloth discharging mechanism operation interface, and click the cloth discharging master control switch in the upper left corner to red.

1.3 Press the reset button "RESET" on the operation panel, the indicator light is off, the start indicator flashes, press down the start indicator, the chain rotates, and the acceleration indicator flashes.

1.4 Click the oven button to enter the heating system:

a. Click the icon of the circulating fan to enter the circulating fan power setting window, click the total button of the circulating fan to pop up a small window for setting the circulating fan power, click on the white bottom number box to pop up a numeric keypad, enter the required output power value, and press OK.

b. Click the upper left corner or the upper right corner of the exhaust fan icon to enter the exhaust fan power setting window, click the manual control button and confirm, click the number box on the white background to pop up a small numeric keyboard to enter the required value and confirm. If you click the automatic control button and confirm, the fan will automatically adjust the power of the fan.

Click the digital box showing the temperature in the oven simulation icon to enter the heating window, click the heating total to set the heating temperature, or you can set the heating temperature of each oven separately. When the heating temperature is below 90 degrees, click the small fire icon to heat, and when the heating temperature is above 90 degrees, click the big fire icon to heat and confirm.

1.5 Correct threading route, put the cloth in the cloth feeding part and guide the cloth 9 from the cloth feeding frame to the operating table), and wear the cloth-out part guide belt along the correct threading route (from the cloth overfeeding roller to the cloth outlet frame) ).

1.6 Press the red stop button on the operation panel, the chain stops, and the start indicator flashes. Pull the guide cloth onto the tentering chain and press the overfeeding wheel push button for about 10 seconds, and wait for the push button indicator to light up. Turn on the motors of each part of the cloth feeding mechanism to "1". Raise the pour chute, apply the pressure of the rolling car, turn on the motors of all parts of the operating table (except the needle protection entrance button), and click the cloth feed control button in the upper left corner of the cloth feed mechanism to green.

1.7 Start the front part of the machine. After the cloth guide has passed the upper needle protection entrance, turn on the upper needle protection entrance button to "1". When the cloth guide goes out of the oven and reaches the cloth overfeeding roller, stop the machine, and connect the cloth guide to the cloth exit part. The conduction band is connected well. Click the main control button of the cloth discharging mechanism to green, turn on the motors of the cloth discharging part to "1" (except the cooling cylinder tension motor switch), restart the machine, introduce the cloth guide into the cloth discharging rack and stop. Turn on the switch of the cooling cylinder tension motor to "1".

1.8 Click the tentering chain control button to enter the chain control interface, enter the width according to the process requirements on the process card and confirm

1.9 According to the process card, find the cloth to be processed and push it to the cloth feeding place to connect the guide cloth, melt the material and put it into the pouring tank (the first 20L is discharged). According to the organization condition of the cloth to be processed and the technological requirements, the cloth rolls or the car is installed. Set the parameters of each part, according to the weft skew of the fabric to be processed, preset the middle fast/middle slow, left fast/right fast of the weft trimmer. Ring the bell to notify that the cloth is ready for the open rotary screen printer ( https://www.hotairstenter.com/product/ ) to turn on. After the ring returns, press the power button, the acceleration indicator flashes, set the speed required by the process and confirm, click the acceleration button and the speed will automatically increase to the required speed.
-- END ---
Share Facebook Twitter
Print Friendly and PDF DisclaimerReport Abuse
Contact Email [email protected]
Issued By licheng
Business Address Zhejiang Province, Shaoxing City Shengzhou City Jinting Industrial Zone
Country China
Categories Business
Last Updated January 27, 2021